…বাংলা
Barlekha Today logo
All the big stories — in your language, updated every 15 minutes
Home › National › News
National

43 Padma char villages without power for five months, 10,000 people suffering

Staff Reporter
43 Padma char villages without power for five months, 10,000 people suffering
Photo: Collected

Forty-three villages in Sadarpur upazila of Faridpur, surrounded by the Padma River, have had no electricity for five months. More than 10,000 people are suffering as a result. As soon as evening falls, the villages plunge into darkness. Students' studies are being disrupted and farmers are in trouble.

Local sources said electricity supply stopped when a submarine cable laid under the Padma River from Dohar in Dhaka snapped at around 8am on 8 June. A rural electricity team came to the spot and searched, but could not identify the place where the submarine cable had snapped.

Forty villages in the nine wards of Diara Narikelbaria Union and three villages under ward 6 of the neighbouring Char Nasirpur Union are in this powerless state.

The area has 10 government primary schools, four madrasas and one secondary school. There are also two markets, two cattle farms and several goat farms. Five months without electricity has caused extreme suffering.

Nayan Sheikh, a resident of Nandalalpur village in Diara Narikelbaria Union, said, 'There has been no electricity in our area for five months. We have to stay in darkness when evening comes. The children's studies are facing many problems. We are suffering in daily work including charging mobile phones.'

Speaking to local residents, it was learned that refrigerators, televisions and various electronic goods are being damaged because there is no electricity. Many cattle farmers are in trouble, and some are being forced to sell their cattle.

Students are suffering the most from the lack of electricity. Their studies are being hampered because adequate light cannot be arranged for studying after evening.

Local people have to rely on solar power because there is no electricity. Solar can run only a light and one fan, but it cannot run a TV or a fridge. Moreover, not every house in the area has a solar system.

Soleman Bepari, a teacher at the Upazila Administration High School in Diara Narikelbaria, said students do not want to stay long at school because there is no electricity. They come one day and do not come the next. Although the school has a solar system, the fan backup does not last long. Government primary schools have no solar system at all, and their condition is even worse.

Diara Narikelbaria Union Parishad (UP) Chairman Md Nasir Uddin said about 1,700 families, more than 10,000 people, have been suffering for a long time because the submarine cable snapped. Electrical goods are being damaged. He said this is the fourth time the submarine cable has snapped since the connection was given, and each time the line was not repaired in less than six months.

The UP chairman expressed anger and said the submarine cables given in other places are of good quality and three-phase. But a low-quality single-phase submarine cable was given in the Sadarpur area, which is why disasters keep happening.

On 12 November, Faridpur-4 (Sadarpur, Bhanga, Charbhadrasan) MP Md Shahidul Islam drew the attention of Power, Energy and Mineral Resources Minister Iqbal Hasan Mahmud in the National Parliament to the electricity situation in Diara Narikelbaria Union.

In reply, the minister said attempts were made to join the cable with the help of divers, but work was not possible in the monsoon season because of strong currents under the Padma and a large rise in water levels due to adverse weather. Another attempt was made with divers on 29 October, but the cable could not be found because of silt under the river, so it could not be joined. It has been decided to work in November-December when the river water recedes.

The minister also said the Rural Electrification Board has already allocated four kilometres of submarine cable to restore the line quickly by installing a new cable, and the tender process for installing the cable is under way. It will be possible to complete all the work and supply electricity through the cable by December.

Khairul Baki Khan, Deputy General Manager (DGM) of the Dohar regional office of Dhaka Palli Bidyut Samity-2, said a new cable cannot be installed for now because of strong currents under the river. But an allocation for a new submarine cable has been received. It is hoped that the electricity connection can be installed by mid-December.

Get the news firstNew stories in your inbox — subscribe free.

More in National