Children Cross a Skeleton Iron Bridge at Risk in Barishal’s Muladi

The iron bridge over the Miachar canal in Ward No. 5 of Nazirpur Union, in Barishal’s Muladi upazila, has stood in a skeletal state for nearly three years. Almost the entire concrete deck has collapsed, leaving only the iron frame, and students and other residents cross the canal over it at risk to their lives.
According to Nazirpur Union Parishad sources, the iron bridge over the Miachar canal was built in 2019 with union parishad funding. Three to four years ago the current caused its pillars to sink, cracking the deck, and movement between Miachar village and the opposite bank has since become extremely risky.
Miachar village lies on the border of Muladi and Gournadi upazilas, and the canal originates from the Arial Khan River. Every day the broken bridge is used by students of Nazirpur United Degree College, Miachar Secondary School, Miachar Primary School, Miachar Dakhil Madrasa and a Nurani kindergarten.
Local residents say crossing by child students is the most dangerous of all on this deckless bridge. Accidents happen often, as children slip and fall while crossing over the narrow iron frame and are injured.
During the last monsoon season, several students including Robin Hossain and Junaid Siddiqui, sixth-grade students of Miachar Secondary School, were injured after slipping and falling. When it rains, guardians often hold children’s hands to walk them across.
Local resident Russell Muktadir said the bridge has lain broken for a long time and people must step very carefully over the iron frame and broken deck. He demanded a new bridge and, in the meantime, a quick temporary arrangement for crossing the canal.
Ali Ashraf Bepari of Miachar village said the pillars sank within a few years of construction and the concrete deck then began to fall away. Work to rebuild the bridge had begun, but it later stopped, making the suffering worse.
Former Nazirpur Union Parishad chairman Mostafizur Rahman Badal Khan said the bridge stands in a border area of the upazila. An attempt was made earlier to repair it, but that was not possible for lack of allocation.
Nazirpur Union administrator and Muladi upazila livestock officer Md Nazrul Islam said a decision has been taken to demolish and repair the bridge. The work will be completed quickly once funds are allocated.
Muladi Upazila Nirbahi Officer Md Golam Sarwar said local people have applied for the Miachar bridge to be repaired. Arrangements to repair it will be made soon.




