…বাংলা
Barlekha Today logo
All the big stories — in your language, updated every 15 minutes
Home › Weather & Environment › News
Weather & Environment

Silt from Kirtankhola Dredging Is Filling Barishal's Sagardi Canal, Raising Waterlogging Fears

Staff Reporter
Silt from Kirtankhola Dredging Is Filling Barishal's Sagardi Canal, Raising Waterlogging Fears
Photo: Collected

A large part of the Sagardi Canal in Barishal city is being filled with silt from dredging of the Kirtankhola River. The canal, dredged only three years ago, is a key source for residents' bathing, household work and rainwater drainage.

Residents fear that if the canal is lost to silt, their water source will close and waterlogging will follow in the area. The Water Development Board (WDB), however, says it did not know that silt was overflowing into the canal.

Dredging is under way nearby to preserve the navigability of the Kirtankhola River. The work began at least 15 days ago. Silt dug from the river is being dumped on the bank, from where it rolls into the adjacent canal. BIWTA is dumping sand there with permission from the WDB.

Residents said the Sagardi Canal flowed through the Jianagar area along the Rice Research Road and reached the Dapdapia Bridge area on the Barishal-Kuakata road, where it joined the Kirtankhola. Many years ago, another mouth of the Sagardi Canal with the Kirtankhola was created in the Trish Godown area.

After that, a dam in the Christian Colony area closed the channel towards Jianagar. However, a two-kilometre stretch from there to Dapdapia Bridge still exists. That stretch has tides, and residents use its water for bathing and household work.

Residents said BIWTA's dredging is under way near the bridge to protect the Kirtankhola River. Before dredging began, BIWTA asked the WDB for a list of low and empty land to keep the excavated silt. The WDB later provided a list of several places.

BIWTA chose a low place next to Charbari Christianpara and began dumping silt there. As silt rolled with water into the canal next to that place, various parts of the canal have filled up and risen like chars.

Nurul Haque Mia, an elderly resident on the canal bank, said, 'The canal filling up is a big concern for us. The canal was dredged in 2024 after the road in front of our house broke. After that, the canal had good water. In the dry season it was convenient to water my small vegetable garden.'

Nurul Haque Mia added that rainwater from the entire Jianagar area drains through this canal, and many residents depend on its water. If the canal fills up in this way, there will be nowhere for rainwater to go, waterlogging may be created, and household wastewater will also lose its drainage path.

Another resident, Faizul Islam, said the canal is a place of emotion for them. He grew up seeing it since childhood. Once boats moved on it, people bathed in it and used its water for daily work. Although it is not used as before, tides still occur regularly, and the canal is important for drainage. If it fills up, people's suffering will increase.

Barishal WDB executive engineer Md Jabed Iqbal said BIWTA recently asked them for a list of low and empty land for dumping river dredging silt, and the place beside Charbari Christianpara was on that list. However, he did not know that silt kept there was overflowing and filling the canal. After learning about it from residents, he spoke with BIWTA's executive engineer.

BIWTA executive engineer Mamun Ur Rashid said the whole river is not being dredged; that part is being dredged to keep the ship anchoring route to the silo normal. Low and empty land provided by the WDB is being used to keep the dredged silt. A pipe was provided for excess water to leave that place, but because the pipe is in a low position, silt went into the canal with the water, creating the problem.

Get the news firstNew stories in your inbox — subscribe free.

More in Weather & Environment